what is cement wastage percentage in NHAI ROAD WORKS
No Answer is Posted For this Question
Be the First to Post Answer
how to balance aggregate during mix design of concrete???? how to calculate moisture content like C/A,F/A and how many percentage using ice instead of water for example of we are preparing ice concrete??????
Define block?
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
Heat gain in buildings is best resisted by
6 Answers AIEEE, B Arch, JMC Projects, Unique Dream Builders,
Why there is no use of sea water in producing electricity
How Much span required for 1 sqm of shuttering(Beam & Slab)
what is the wait of cement in different concrete mixes from M15 TO M50
What is Current Shuttering rate (labour + materials) for Columns, Beam & Slab on Item rate basis ?
Coarse aggregate & fine aggregates are called inert material when used in RCC work because------
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
What is the use of array command?