give the full form for upvc pipe & cpvc pipe

Answers were Sorted based on User's Feedback



give the full form for upvc pipe & cpvc pipe..

Answer / karan sardana

upvc--> unplasticised pvc; used for making water pipes
cpvc--> chlorinated pvc; used for making door frames, also known as rigid pvc.

pvc--> poly vinyl chloride

Is This Answer Correct ?    177 Yes 34 No

give the full form for upvc pipe & cpvc pipe..

Answer / sagar tiwari

upvc=unplasticised poly vinyl chloride;used for making door
frames

cpvc=chlorinated poly vinyl chloride;used for making water
pipes [hot water and cold water both}

Is This Answer Correct ?    130 Yes 17 No

give the full form for upvc pipe & cpvc pipe..

Answer / thilak de silva

what are the proper pipes for salt water line

Is This Answer Correct ?    42 Yes 23 No

give the full form for upvc pipe & cpvc pipe..

Answer / aman gupta

PPR Pipes

Is This Answer Correct ?    7 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

List out the potential risk factors for workers on the construction site?

0 Answers  


i want measure water capacity in 25'diameter and 7'height of water in circular storage tank in liters how?

7 Answers  


A person becomes tired when ups a stairs because of––

1 Answers  


Explain what are the phases inspections are done by local authority while construction?

0 Answers  


how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...

0 Answers   Ramky,






what is the I.S. CODE of RCC

2 Answers   CEPTAM,


how do you measure the 1:2:4 and 1:1:2 proportion rcc concrete for one cubic metre? what is the cement qty. sand qty. jelly qty.

1 Answers   VR Residency,


what is the out turn of one masson in plastering, masonary work in 8 hours, with limited healper? what is the out turn of corpender in form work? wood work? in 8 hour with limited healper? what is the out turn of bar bendarin 8 hour with limited healper for slabs, beams, coloumn?

2 Answers  


how much of the strength comes from post-production curing

0 Answers   Focus Energy, L&T,


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

0 Answers   Junior Engineer,


If a slab concrete is placed with M-20 grade concrete, actually it has to be placed with M-30. what are the rectifications / measures to be taken after concreting is done.

0 Answers   BARC,


Difine coffer dam ?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)