how to calculate sand, aggregate and cement in m25 concrete?
Answers were Sorted based on User's Feedback
Answer / rohit singh
Grade m25= 1:1:2 , sum=1+1+2=4
Dry concretein 1 cum =1. 52
Cement =1. 52/4=. 38*28. 8=10. 94bags cement /cum concrete
Sand=1. 54*1/4=. 38cum
Aggregate=1. 54*2/4=. 76cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / narayan rijal
1.52/(1+1+2)*28.81=cement bags
0.41=sand
0.83+aggregate
| Is This Answer Correct ? | 3 Yes | 8 No |
Please tell me present is code no for steel structure work. Thanks.
what is the diff between sudden loading and impact loading?
The name Taapsee Pannu is associated with which film A) baar baar Dekho B) freaky Ali C) Rustom D) pink
why no deduction for steel is made in the volume of concrete?
can i get placement in 2nd or 3rd year in college..
what is defenation the rolling margine ? .. what is % for steel & what its effects if it is + or - ?
WHY THE WIDITH OF COLUMN IS TAKEN FOR DESIGN OF ISOLATED FOOTING??
What is difference between MS and Tor steel ?? Please ellobrate...or state its charactersitcs??
4 Answers CLG, Indiabulls, TOR,
IN LOW RISE BUILDING PER SQ FT HOW MANY MATERIAL REQ. SAND &CONCREATE&CEMEBT
what is the praposion of M30 concrete mix.
What is meant by solid geometry?
how can i calculate pcc and rcc cu.mtr rate? specify labor and material cost should be diff
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)