how to calculate sand, aggregate and cement in m25 concrete?
Answers were Sorted based on User's Feedback
Answer / rohit singh
Grade m25= 1:1:2 , sum=1+1+2=4
Dry concretein 1 cum =1. 52
Cement =1. 52/4=. 38*28. 8=10. 94bags cement /cum concrete
Sand=1. 54*1/4=. 38cum
Aggregate=1. 54*2/4=. 76cum
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / narayan rijal
1.52/(1+1+2)*28.81=cement bags
0.41=sand
0.83+aggregate
| Is This Answer Correct ? | 3 Yes | 8 No |
12. Have you ever been asked to leave a position?
What is pile foundation?
what is the diffrence between grade beam and plinth beam
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
What is the Null Point of chimney in Power Plant
what type of waterproofing and procedure using in building?
difference between tmt and tor steel
How many types bend used in civil reinforcing
Can we use PPC cement for RCC works? Upto which grade it can be used?
what"s the formula find the cement consumption for brick work 23 thick wall 1 m3?
7 Answers L&T, Vipul Chemicals,
Sir please Bhel Enigineer trainy test papaers in civil engineering
What is the difference between lap splice length and development length of rebars?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)