Difine coffer dam ?
Answer / elina lakra
A temporary dam constructed to exclude water from a specific area to take up construction in dry area.
| Is This Answer Correct ? | 2 Yes | 0 No |
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
What is the difference between one-way slab and two-way slab?
when we select buildup beam
How to calculated +ve & -ve Bending moment coefficient in water tank design for design of side walls.
What is a BBS?Find out the cutting length for a 600*600 foundation with 50 mm cover
How to find quantity of cement bags, sand, coarse aggregate, from 1m3 of concrete of m20 design?
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
waht is the angle of reposae
at what height brick masonr, block masonry & Concrete wall can construct in a day ?
How should i calculate Cutting length of haunch bar in a raft including cover?
In beams why the depth is > width
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)