Answer Posted / elina lakra
A temporary dam constructed to exclude water from a specific area to take up construction in dry area.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
what is the difference between np2 and np3 concrete mix
trapozidal
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy
1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall
Which stone is best for wall construction Laterite Stone or Cement Blocks
why top layer of block work shoud be full size if any cut block adjustable than another layer?
What in your opinion makes you the most suitably qualified candidate for this post of civil engineering technician?
Explain how you can turn off the display for dimension in CAD?
yasser arfatcompleted his degree in civil from which university
how to calculate freeboard in under ground water tank and technical details
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
How much the quantity of Dry material of Crush for 1:2:4 Concrete, using pan 3/8'' down....
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
how many kg of 20mm, 10mm, dust available in one ton stone boulder
How will you Engage Labours on Site?