Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


During estimation of walls of superstructure...which unit we'll use with quantity.cube or square

Answers were Sorted based on User's Feedback



During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / sandeep bhardwaj

Dear student brick work measuring unit is m³ for more then half brick work,if it is less than half brick work than unit is m²

Is This Answer Correct ?    6 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / vikas d v

depends if u knw the thickness u can use sqm if u dono u should use cum

Is This Answer Correct ?    2 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / mohammed sanaulla

practically brick work is done 2 ways i.e 9"thickness wall & 4.5"thickness wall.
9"thickness brick work is done for outer wall or main wall and 4.5" thickness brick work is done for partition wall.

9" thickness wall we considered as cu.m(workout for brick work contractor)
4.5" thickness wall we considered as sq.m(It will not workout for any contractor if it is done in cu.m)

Is This Answer Correct ?    1 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / ibrahim adel

Dears, your answers depends on brick works however the question did not mention brick or block walls . Also they should be clear in the question in order to prevent misunderstanding.


Thanks,

Is This Answer Correct ?    0 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / ibrahim adel

square

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

what is meant by shear wall?

2 Answers  


For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.

0 Answers  


clear cover means the distance between main bar outer face to shuttering face. Is it right?

4 Answers  


what is the size of 50 kg cement bag ? gunny & paper

10 Answers   NTPC,


How Many Cement Bags Are Used in 1 Sqm Area for Plaster????

8 Answers   Era Infra Engineering, FactSet Systems, Indu Projects, L&T, Reliance, Rites,


wheather Micro silica/silica fumes is an ad-mixture or accelerator.

5 Answers   Coastal Projects,


How to calculate the quantity of water in cement mortar eg. CM 1:3?

3 Answers  


how much difference we have to provide when column steel staggered

3 Answers  


There are two buildings one taller and one shorter whose time period will be grater and similarly the frequency ?

0 Answers  


what type offoundation suitable for clayey type soil

2 Answers  


how to draw road profile

4 Answers   L&T,


What is the FE 250 structural steel of 8mm tk plate testing sample intervals with IS code or international code?

0 Answers   GVR, Howe Engineering, L&T,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)