Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


During estimation of walls of superstructure...which unit we'll use with quantity.cube or square

Answers were Sorted based on User's Feedback



During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / sandeep bhardwaj

Dear student brick work measuring unit is m³ for more then half brick work,if it is less than half brick work than unit is m²

Is This Answer Correct ?    6 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / vikas d v

depends if u knw the thickness u can use sqm if u dono u should use cum

Is This Answer Correct ?    2 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / mohammed sanaulla

practically brick work is done 2 ways i.e 9"thickness wall & 4.5"thickness wall.
9"thickness brick work is done for outer wall or main wall and 4.5" thickness brick work is done for partition wall.

9" thickness wall we considered as cu.m(workout for brick work contractor)
4.5" thickness wall we considered as sq.m(It will not workout for any contractor if it is done in cu.m)

Is This Answer Correct ?    1 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / ibrahim adel

Dears, your answers depends on brick works however the question did not mention brick or block walls . Also they should be clear in the question in order to prevent misunderstanding.


Thanks,

Is This Answer Correct ?    0 Yes 0 No

During estimation of walls of superstructure...which unit we'll use with quantity.cube or squar..

Answer / ibrahim adel

square

Is This Answer Correct ?    1 Yes 2 No

Post New Answer

More Civil Engineering Interview Questions

how to take quantity of steel per cum in columns

2 Answers   ERRA, Skyline Builders,


for 100sft of Cement plastering ratio 1:6 How much quantity of cement and sand required.

6 Answers   J.K. Organization, L&T,


what is diffreant types of water proofing chemical tell me please

2 Answers   Apex,


why is the column design?

0 Answers  


How did street originate in the plumbing term street ell?

0 Answers  


all rod lapping formula

3 Answers  


Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?

0 Answers  


Coarse aggregate & fine aggregates are called inert material when used in RCC work because------

5 Answers  


nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none

1 Answers  


What is allowable limit of silt in river sand for concrete

3 Answers   UIPL,


What is the ratio of cement ,sand, and aggregate to be used in M20 grade of concrete when excavating 200 x 200 x 200 mm of sand from soil

4 Answers  


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

0 Answers   AIZAZ General Contracting General Maintenance, GK Realtors,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)