During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
Answer Posted / sandeep bhardwaj
Dear student brick work measuring unit is m³ for more then half brick work,if it is less than half brick work than unit is m²
| Is This Answer Correct ? | 6 Yes | 0 No |
Post New Answer View All Answers
how much need sand and cement for 1 cft roof construction?
What are the different methods for drawing an arc?
What are wooden shingles?
I need old MMUP exam question and answer for Civil engineering
What is the cost of formwork for columns/beams/rcc walls also what is the cost of shuttering for roof slab at height of 25 feet
whats is difference between anchorage length and development length
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
Why joints are provided?
Explain major difference between auto level and dumpy level?
57. Calculate the volume of a truck loaded with stone chips whose data are as follows– 5 Top Length - 13-9, 13-10, 13-09 Bottom Length - 13-11, 13-10.5, 13-10 Top width - 8-7.5, 8-8, 8-7 Bottom width - 8-7, 8-8, 8-7.5 Depth - 2-0, 1-11.5, 1-10, 1-11, 1 -10.5, 1-11.75, 1-11
What is the difference between EPC,DBOOT and BOOT.
Define What is rigging?
how to stop beam concrete between column
List out some of the software program that can be useful for architect?
How is the leaning tower of pisa supported?