During estimation of walls of superstructure...which unit we'll use with quantity.cube or square
Answer Posted / ibrahim adel
Dears, your answers depends on brick works however the question did not mention brick or block walls . Also they should be clear in the question in order to prevent misunderstanding.
Thanks,
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is meant by engineering drawing?
How much cum. Brick work can do by 1 madon
in 2 way slab can additional compressive reinforcement can be provided if yes than in which conditions it is required ?
What is the difference between EPC,DBOOT and BOOT.
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
how to nfind out the specific gravity of sand.aggregate,water please help...
WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?
how u design STAGING for Superstructure in BRIDGE construction?
My daily concrete volume of M25 concrete is 1st day= 25 Cum 2nd Day = 45 Cum 3rd Day = 55 Cum 4th Day = 22 Cum 5th Day =72 Cum 7th Day = 49 Cum. What will be acceptance criteria of concrete considering as per is 456 cl.15 and table 11 (cl 16.1 and 16.3).
For what building Built-on balconies are preferable? What are the advantages?
What do you mean by the word 'shear'?
how pumping of concrete effects the quantity of material used in it?
Define What happens to Load at yielding ?
how do you stabilize a waterlogged area in road construction
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.