How to fix steel in rectangular footins?
I.e first along the length or first along the width??
Answer / n.r.gupta
first place the steel in breadth i.e. in shorter span and over it in longer span.
Is This Answer Correct ? | 7 Yes | 1 No |
I want to know the material required per Square foot in rcc roof i.e.Steel ,Cement,
how do we calculate quantity of gypsum for 1m3? 1m3 = ?kg
pile load testing procedure
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?
how many reputations of ply wood for concrete works can be used?
what is the weight of 8mm dia steel with 1 meter length. Is there any formula to calculate the weight for any given diameter
48 Answers Benny Industries, D M Systems, L&T, MYC Infra, OL, PWD, Shell, SMB, SODI, Spyro Engineers, TNS, Welspun,
explain kn/sqm in detail.
what is slope provided to floor?
what"s the formula for circumference?
In IS:456-2000 the workability of concrete is given in mm (slump)in cl.7.1. In IS:10262-1982, cl.3.3.4 & table-6 says +/- 3 percent adjustment is required in the quantity of water (calculated as per table-4 or 5), for each increase or decrease in the value of compacting factor (i.e. workability of concrete) by 0.1. How it is possible to calculate the exact quantity of water required for a particular grade of concrete? What is the relation between Slump & Compacting factor of concrete?
How can I make justification between using concrete grade c35 compare c37?
How much wastages taken in 1. cement 2. steel 3. fine aggregate 4. coarse aggregates (10mm, 20 mm)