How to fix steel in rectangular footins?
I.e first along the length or first along the width??
Answer / n.r.gupta
first place the steel in breadth i.e. in shorter span and over it in longer span.
| Is This Answer Correct ? | 7 Yes | 1 No |
Prop carrying load capacity
show answer/ calculate-1-2-4 ratio-concrete -cement-sand- metal-water - please brief calculation
we are roofing contractors,we are filling a bill in work contract 4.12% method, we collecting 4.12% from our customer but every month we have been paying the vat at 2% from our pocket on the total value of bill. our auditor told me the above method do not collect 2% from the customer side is it true?
what is the bar bending schdule
what is bond strength of concrete
how to find out compressive strength of concrete
What is meant by engineering drawing?
Wat is the optimum value of tensile strength of concrete after 28 days??
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.
Spider cracks occur in beam bottom due to––
Ultimate strength to cement is provided by which chemical?
how do we calculate quantity of cement , sand and aggregates in 1 m3 of M30 grade concrete ?
31 Answers ABES Engineering College, Gammon, Jalanidhi, NCC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)