How to fix steel in rectangular footins?
I.e first along the length or first along the width??
Answer Posted / n.r.gupta
first place the steel in breadth i.e. in shorter span and over it in longer span.
| Is This Answer Correct ? | 7 Yes | 1 No |
Post New Answer View All Answers
What is meaning of FREE STANDING STAIRCASE ?
What is c.g.i sheet which used for roof??
Explain what is 1/8 on the architect ruler denotes?
what s the standrd size of pvc fittings ,like elbow, bend,tee etc ? please explain with figure ?
Explain soil analysis?
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
Please tell me any one, how many quantity concrete paver block fixing perday ( 8hours) per mason??
where i can get material costs on weekly basis
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
please give me the rates of RCC(CUM), PCC(CUM), Brick Work(CUM), Tile Flooring, Saria Shuttering
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
indian standard split spoon sampler