If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
Answer Posted / krishna
28 days
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Maximum cement content in 1cum for RCC and PSC? (please give IS,IRC referance?
Explain what is Hybrid Foundation?
How can i do RCC rate analysis?
Why we provide hair pin for shed
Types of column foundation and how to calculate its steel quantity.
How cracks in concrete can be avoided?
How does a traffic light signal work ?
How to find out slope footing concrete
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
what's the formula for calculate pcc for matt(45mm aggregate)?
what is civil all interview questions
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Which Types Of Bricks ?