suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
No Answer is Posted For this Question
Be the First to Post Answer
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
what is mean by short coloumn? it is depend on the height? or dia of coloumn.?
why the brick is red in colour?
What is meant by a context menu in a cad software?
can i get placement in 2nd or 3rd year in college..
How to calculate the sand and aggregate in concrete
how we can calculate the capacity of a proposed canal in a command area.
5 Answers KPL, MPPSC Madhya Pradesh Public Service Commission,
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
whaat is blister in box girder bridge and what is its function..
What"s the brick size we use in construction?1.190x90x90 2.230x100x75 Which one "s correct?
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)