How much steel needed for 1 m3 concrete for slab?

Answers were Sorted based on User's Feedback



How much steel needed for 1 m3 concrete for slab?..

Answer / md asfak

1.2%steel for volume of concrete

Is This Answer Correct ?    9 Yes 3 No

How much steel needed for 1 m3 concrete for slab?..

Answer / rajesh kumar jha

80 kg / m3

Is This Answer Correct ?    1 Yes 0 No

How much steel needed for 1 m3 concrete for slab?..

Answer / dxb

For 1 cumt of concrete 120kg of steel is more then enough

Is This Answer Correct ?    2 Yes 2 No

How much steel needed for 1 m3 concrete for slab?..

Answer / done

Clearly it's a tricky question
Concrete slab do not need steel so 0% steel required
If they asked you about reinforced concrete slab then n then only the percentage will lie between 1%-3% according to the load on tensile side

Is This Answer Correct ?    0 Yes 0 No

How much steel needed for 1 m3 concrete for slab?..

Answer / venkata raghu

Slab can be defined in sq mts

Is This Answer Correct ?    0 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

What is the difference between Wraft and file foundation and where these are used ?

2 Answers  


the size of one block is 390mm×190mm×190mm.then how much block will required for 4.6m × 3.4m wall.the thickness of wall is 190mm

1 Answers  


What are the functions of a column in a building?

1 Answers  


rate analysis of shuttering

2 Answers  


How much percent of steel use in concrete members etc.slab,beam,lintal,colmn,raft fondation according to concrete volume? Kindly reply me I am in dbout plz

3 Answers  






What is difference between limit state and working stress method? How it is applies in building structure.

2 Answers   L&T,


anyone can tell me the consumption of steel and concrete per sqft.?

2 Answers  


 Describe a time when you anticipated potential problems and developed Preventive measures

0 Answers   Graham Construction,


what is diff between auto level and dumpy level?

4 Answers   ABB, L&T, NCCL,


Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??

0 Answers   RS Construction,


how we check the thickness and line of ceiling plaster.

0 Answers  


Whta is the proportion of M30

2 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5084)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16631)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1094)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)