Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How much steel needed for 1 m3 concrete for slab?

Answer Posted / rajesh kumar jha

80 kg / m3

Is This Answer Correct ?    1 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

2077


What is packing Factor ?

1495


How do we calculate absolute pressure?

1419


If u want ur Ans.Of any Question so mail me skatiyar011@yahoo.in

2060


1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?

2323


How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?

1741


How many Sft of Level Plaster per Kg

1660


how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?

1714


How to find out slope footing concrete

3005


A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals

2316


WHAT IS THE MAIN DIFFERENCE B/W HIGHWAYS AND MOTERWAYS?

2516


TO CONSTRUCT A 1800 SQFT CAPACITY UNDERGROUND WATER TANK HOW MUCH CUFT CONCRETE IS REQUIRED AND HOW MUCH REINFORCEMENT IS REQUIRED. FOR COSTING

2573


What are the different softwares used for cad?

1353


what is the ingredient value of 40mm and 20mm aggregates?

2050


How many hours should traffic be not allowed after completing wbm road or bst.and min how many hours should road rollers be used.