Answer Posted / dxb
For 1 cumt of concrete 120kg of steel is more then enough
| Is This Answer Correct ? | 2 Yes | 2 No |
Post New Answer View All Answers
at what pressure ply-wood is obtained by gluing wooden sheets
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?
Find out Cutting Length of Steel for Right angle Triangle? Where Opposite Side 4m, Adjacent side 6m. (Assume cover 40mm)
What is Curtailing of R/F
plz.show development and anchorage length in simple diagram.
A 16 pile group, consisting of diameter concrete piles, were cast in situ in a clayey soil whose unconfined compressive strength is 1100 psf. Each pile is 60 ft long and the pile spacing is 2.5 times the pile diameter.The water table is at the ground surface and saturated unit weight of the clay is 118 lb/cu.ft. using a factor of safety 3 and a reduction factor =0.45, compute the allowable capacity of the piles acting as individuals
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
What happens to Load at yielding ?
what is diversion?
How can we demolish concrete beams?
Plasterers do how many sqm with spray plaster machine? By hand one mason does 10m2/day. How much they do in Dubai with spray plaster machines?
What do you mean by tolerance factor of concrete ?
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
I HAVE APPLIED FOR 20TH UES ARMY. I WANTED TO KNOW WHEN WILL I RECEIVE CALL LETTER FOR THE SAME.
how much cement and sand required for 100sqm of wall plastering in different proportions