Can anyone suggest how to determine scheduling of
reinforcement of floor beams from Staad model,other than
clicking each beam respectively 7 noting down the values ?
No Answer is Posted For this Question
Be the First to Post Answer
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.
3 Answers ATS, Eurotech Construction, Juniper Networks,
WHAT IS PMB IN CASE OF ROAD PAVEMENT? WHY PMB IS PREFERED THAN ORDINARY BITUMINIOUS SURFACING?
What is the allowable silt content for concrete works?
how to do connection between steel beam (I-Section) with R.C.C column??
The largest size of paper used in plotter to print the drawing made by Autocad .
can i get placement in 2nd or 3rd year in college..
What is the difference between lap splice length and development length of rebars?
how many pcs of steel bundule in all dia 8,10,12,16,25,32,40 please how many pcs in bundle of packing??
List out some of the checking’s, done at the completion of construction?
What is type failure of road surface? how to repair the failure of road surface?
What is mean by Rolling Margin Of Steel????
4 Answers Dilip Buildcon, L&T, NCCL,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)