How bonding is done for composite massonary?
Answers were Sorted based on User's Feedback
Masonry work consisting of two or more building material is termed as composite masonry.
Purpose- to have superior material for facing.
Should be properly banded against unequal settlement.
This may be achieved by mortar, metal cramps, lead plugs etc.
Is This Answer Correct ? | 11 Yes | 0 No |
Answer / mohit gupta
1. Using of composite materials such as fibre reinforced
polymer composites (FRPC) instead of steel in masonry
structures is nothing but composite masonry.
2. Mainly composites have been extensively used in the
aerospace transit car and chemical industries as well as in
sports equipment manufacturing.
3. Their structural phenomenon specifically in road and
bridge infrastructures in cold climates is a newer phenomenon.
4. Composites use high strength fibres in many different
forms combined with a variety of resins. The resins used to
form a composite include epoxile phenolics bismaleinide and
cyanate esters.
5. There are different manufacturing processes but common to
al and very important is the application of controlled heat
and pressure after laying.
6. The most commonly used fibres are glass (e-glass s-glass)
aramid (also known as kelver) and carbon.
Is This Answer Correct ? | 4 Yes | 6 No |
Minimum size of the particles of silt soil
What is cement-concrete ratio ?
What will be the angle for hook in column ring for column size 600x750 mm bar size 10mm for ring
which has high compressive strength between hollow block and brick masonry?
Kindly tell me how much extra steel bars are provided in a RCC roof and distance of bends in different sizes of roofs. Please also tell me that bars provided in chajja are taken seperate or main bars or short bars are extended in chajja. please send me the answer@ suhail_akhter@hotmail.com
How we calculate the actual diameter of the TMT Steel
8 Answers Brigade, Kalpataru, Simplex,
How much cement will require for 1Rmt Skirting laying
how much unit weight of an RCC Box 3.0mX3.0m will be of design mix concrete M30
what's the formula for calculate pcc for matt(45mm aggregate)?
how can i calculate cement in brickwork
how to creat mix m-20? and how to check shuttering & how is mark layout at open ground
1) what is the difference between development length & overlap length ? 2) why extras are provided at top and bootom in a beam of slab? 3) why stirrups are provided at 0.3l at supports and 0.4l at center? 4) is column a compression memeber if yes how & beam is which type of memeber?