for columns reinforcement the lap length is not provided then
how to rebar the rods then how rebar should be lapped
Answers were Sorted based on User's Feedback
Answer / n.rajesh guttedar
1) In the columns portion chip the old concrete in a small
depth at least we get the tie beam rods.Then make L bend of a
columns rods and weld it.
2) In the columns portion drill a holes to insert the new rods
and pour the bonding chemical ( Bonding agent )
3) In the columns portion fix the MS plate with the required
holes for the holefasners insert.And make the columns in U
type shape and weld it.
| Is This Answer Correct ? | 7 Yes | 1 No |
By welding the rod,and the welding should be in stagerred
type.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / suresh s
1st thing it should find that problem While Concrete Pouring Time immediately make The reinforcement at what length needed as per drawing.
2nd thing retrofitting method
3rd thing chip the column at lap height and tie the rod and weld it and pour the new concrete.
| Is This Answer Correct ? | 2 Yes | 0 No |
Answer / sjtbehera
I think alternative step is welding and spiral binding
| Is This Answer Correct ? | 0 Yes | 2 No |
Any body tell me how can we calculate 1m3 quantity of cement sand aggregrate in kg.
what is means of M50,M20,M15 like this please tell me ?
What letter follows after these, O, T, T, F, F, S, S, E, __?
How many bags of cement will be required for 45.5 M^3 Concrete with the ratio of 1 Cement+1 Crash+ 2 Sand+1 Gravel?
0 Answers First MicroFinance Bank FMFB,
1.DIFFERENCE BETWEEN NOMINAL MIX AND DESIGN MIX? 2.WHAT IS MEANT BY STRUCTURAL DESIGN? 3.IN STAAD WHY WE RELEASE MOMENT TO A MEMBER? 4.ON WHAT BASIS PARTIAL FACTOR OF SAFETY ARE DECIDE?FROM THE LOAD COMBINATION? 5.WHY WE PROVIDE EXTRA BAR & DEVELOPEMENT LENGTH AT TOP? 6.FULL FORM OF SPT & SMB? 7.WHAT IS MEANT BY ITP IN A CONSTRUCTION PROJECT? 8.WHAT IS LEAST COUNT OF THEODOLITE SURVEY? 9.WHAT ARE THE CAUSES OF FAILURE OF FOUNDATIONS AND REMEDIAL MEASURES? 10.WHAT ARE THE VALUES OF COMPRESSIVE STRENGTH? 11.STEEL CALCULATION FOR FOOTING,BEAM & SLAB? 12.WHAT IS MEANT BY GANTRY GIRDER? 13.IN SITE HOW WE CAN IDENTIFY THE ONE WAY, TWO WAY SLAB? 14.DIFFERENCE BETWEEN ANCHORAGE LENGTH & DEVELOPEMENT LENGTH? 15.BEARING CAPACITY OF STEEL SHUTTERING?LOAD CARRYING FOR SHUTTERING?
Some one plz help me sir ..m gonna start my g 2 rcc building i have a simple design and i want material estimate plz sir help me.someone plz mail to blue print .thnq
how to convert cement, sand aggregate quantity from M3 to kg with full description?
What would be the quantity of cement:Sand:Aggregate (1:2:4) requirement for slab casting measuring 1mtr x 1mtr x 0.10 mtr (4 inches)?
what is irrigation
2 Answers Era Infra Engineering, Prothious,
how to take out quantity of steel used in column and beam?? what is standard formula for it???
area of 8mm rod
How much cement,sand,bricks and water needed for 1square metre brick work?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)