can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???
No Answer is Posted For this Question
Be the First to Post Answer
a g+2 building having mezenine floor ,but stair is approching only 1st and 2nd floor, in this case stair is calculate in plinth area for mezenin floor or not?
How to calculate the quantity of water in cement mortar eg. CM 1:3?
a wall having area 100 sqft and bricks size 19cm*9cm*9cm so how many bricks required...
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
i need gate exam civil engineering question papers with answers
whate the size of bricks are avalable at site
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
What is the difference between Hinged and pinned in Column ends
Define What is the distance between railway tracks?
What is factor not to be taken in consideration in mix design?
What is the different type of slump test indications?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)