you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
If we don't have drawing for Excavation of building,At what rule we will go for excavation and how much depth will go for a villa?
How is make concrete cube?
How to estabilish reinforcement Steel rolling margin for a building projects ?
What is the material consumption- cement,sand,tiles etc for Toilet dado?
what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????
quantity of material needed for rubble stone masonry for 1:4 and 1:6
why do we not deduct volume of steel to find actual volume of concrete in practical???
how can we calculate steel value, depending on load
How much river sand contain the 6 & 10 wheeler truck? Or Maximum sand that any type of truck carry?
it is a corrected question." make a list of engineering property(properties) of soil.
How to calculate laplength for 3 floors
What is the absolute pressure scale?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
HOW SOON CAN YOU TRAVEL DON TO ANY LOCATION POSTED U?
why demand factor less then 1 ?