you are planning to paint a newly fabricated workshop
building made of structural steel of 10 tons total mass.you
are require to paint 1 cot of primer and 2 coats of top
coat.How many liters of primer and top coat you will request
Answer Posted / muhammad akram
Total Mass of Workshop = 10,000 Kg
Sq.ft of Work shop structure = 1300 cu.ft (Estimated)
Red Oxide required = 25 Liter
Top Two Coats = 50 Liter
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how much need cement bags for block work of wall approx 1000 hollow blocks 20x20x40cm
Which are the Steel tests ?
Re: Can anybody help me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates? please my email id is smgujjal@gmail.com
Spider cracks occur in beam bottom due to––
what would be the design load of R.C.C Cooling tower per cell.?
how to control PQI (Project Quality Index)
Basic civil interview questions
How to Rectify deep crack formed on Brick Wall? Explain the method of rectify the defect?
What is absolute coordinates?
1. HOW MUCH CEMENT AND SAND REQUIRED TO PLASTER 100 SQM WALL. 2. HOW MUCH CEMENT AND SAND REQUIRED FOR SCREED WORK OF AREA 30 SQM
States some of the tool bars used in cad?
Which is stronger solid steel rod or hollow steel pipe?
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
How you can turn off the display for dimension in CAD?
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?