Answer / Ajit Singh
Calculating the rate of analysis for a concrete mix can be complex due to various factors, such as the type and proportion of materials used. However, here is an example calculation for a simple mix with given proportions:n
1. Assume a concrete mix with the following proportions by volume: 1 part cement, 2 parts sand, 3 parts aggregate (stone), and water to achieve workability.
2. For 100 cubic meters of concrete, calculate the required volumes of each material:n - Cement: 100 m³ * (1/4) = 25 m³n - Sand: 100 m³ * (2/6) = 50 m³n - Aggregate: 100 m³ * (3/6) = 75 m³
3. Calculate the total weight of each material:n - Cement: Assuming a density of 3,150 kg/m³, the weight is 25 m³ * 3,150 kg/m³ = 78,750 kgn - Sand and aggregate: Assuming an average density of 2,650 kg/m³ (common for sand and stone), the total weight is (50 m³ + 75 m³) * 2,650 kg/m³ = 193,750 kg
4. Calculate the total weight of water needed for workability.n - Assume that the water occupies approximately 20% of the total volume: Water weight = 100 m³ * (0.2) = 20,000 kg
5. Calculate the total weight of the concrete mix: Total mix weight = Weight of cement + Weight of sand and aggregate + Weight of water = 78,750 kg + 193,750 kg + 20,000 kg = 292,500 kg
6. To calculate the rate of analysis (or productivity), you need to know the time required for mixing and placing the concrete. For example, if it takes 8 hours to place 100 m³ of concrete, the rate of analysis is 100 m³ / 8 hours = 12.5 m³/hour.
| Is This Answer Correct ? | 0 Yes | 0 No |
The Geological formation under subanshiri dam is- (1) sedimentary rock (2)metamorphic rock (3) igneous rock (4)none of the above
What is the meaning of 'variation' in construction of residential buildings
How do piles bear loads
I dont know english very well to speak,in interview if they ask to introduce yourself means how to answer in english?
The mixture of different ingredients of cement is burnt at?
If drainage is main things then which respect the super Elevation may be provided?
how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg
different types of footing. and difference between footing and foundation
what is the effect of duration of earth quake on framed structures ?
Describe why concrete must be compacted after it is poured?
Define the various stages of the project planning process in construction.
what is the least count of staff ?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)