How will you determine the capacity of a reservoir with help
of contur
Answer Posted / vydehi
by calculating the area of that contour.
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
Providing and casting in situ cement concrete M-25 of trap/granite/quartzite/gneiss metal for rcc, Providing formwork,Curing the concrete and Complete. what is rate per Cum. and what is rate for M-30 Grade Concrete.
Explain the latest method to detect a crack in a building?
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how to convert sand in Cft to Kgs
What is type failure of road surface? how to repair the failure of road surface?
A sieve analysis results in 100% retained in no. 50 Sieve, the fm is?
What is the use of array command?
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
Dear Sir, I work in hydro project. I want to hire Scorpio/ Bolero on monthly basis. But how can i justified its amount (Hourly basic). Please solve my problem
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
What is factor not to be taken in consideration in mix design?
What is the Maximum %age of Steel in columns and beams ?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
02. a. The diagonal of a 9 cube…………… 1 b. Surface area of 9 cube…………… 1 c. Volume of 1-3 cube …………… 1 d. Compressive area of 6 cube …………… 1 e. Top & Bottom face of a Cylinder/Cube is to be proper leveled to deliver the…………………………..…… properly.