Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How will you determine the capacity of a reservoir with help
of contur

Answer Posted / vydehi

the area of contour can be determined by dividing it into suitable parts(triangles,rectangles). then sum of the area of all definite parts will give total area.the conversion of scale is important.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how do you calaculate the total steel quantity of an rcc building using thumb rule?

3750


what is the effect of duration of earth quake on framed structures ?

2294


How many days should curing of plastering, brick work and concrete

1722


What is the formula for figuring out how many gallons of water are in a pipe by the foot?

1190


Slump Values for works?

2258


PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.

2637


What is the release of lien?

1229


What are the reasons for geotechnical site investigations in uganda?

1202


how to convert sand in Cft to Kgs

1989


2. In a container filled with each of the following materials, at a porosity of 40%, determine the upward gradient required to cause the quick condition (a) Lead shot with a G = 13.75; (b) Fibre beads with G = 2.15; (c) Sand with a G = 2.32

2516


With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr

2499


In case if concrete box girder bridges how is the number of cells determined?

1229


Explain the different types of building contracts?

1164


can i get civil engineering test papers.......?????

2524


cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate

1730