how much steel is required foe following components..
footing-
plinth beam-
column-
beam-
slab-
Answer / sjtbehera
footing-2.5%
plinth-3%
column-2%
beam-2.5%
slab-3% of toal cum
| Is This Answer Correct ? | 3 Yes | 5 No |
Why are steel plates inserted inside bearings in elastomeric bearings?
What are the applications of modulus of elasticity?
How to calculate(Thumb rule) the consumption of steel per cubic meter for different concrete members.
how to calculate water cement ratio?
6 Answers IVRCL, Saroj Group, Sobha Developers,
What the approval that owner will give to contractor during construction project period? What will the affect on project if delays due approvals?
How many different between estimated quantity and practical work at site.
what is periode of deshuttering for different area of slab
what is c4x light weight cement blocks
How can we cross check the excavation and backfilling quantities.
what is the pile
1 Answers Chandra Group, GVR Constructions, Simplex,
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
why building got air crack? if it get in one particular are what is means?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)