how much steel is required foe following components..
footing-
plinth beam-
column-
beam-
slab-



how much steel is required foe following components.. footing- plinth beam- column- beam- slab-..

Answer / sjtbehera

footing-2.5%
plinth-3%
column-2%
beam-2.5%
slab-3% of toal cum

Is This Answer Correct ?    3 Yes 5 No

Post New Answer

More Civil Engineering Interview Questions

If the first roof slab is not deshuttering in this time shall I start column raising work in second roof is it correct or not

2 Answers   Al Fara, Unity Infraprojects,


clean earthing and dirty earthing

1 Answers   CSCEC-China State Construction Engineering Corporation,


Water cement mixing in hopper less mixture machine is better than hopper mixture machine because:

1 Answers  


5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

0 Answers   KIOCL,


Rate analysis of Vitrified tile in cement mortor 1:3

0 Answers   Design Space, Muthoot Group,






how to calculate quantity of steel in a slab , coloumn and beam

1 Answers   JSW, Om Sai Builders,


what shape of coarse aggregates are ideal for concreting?

7 Answers   Rites,


How many kilograms of sand required in cufic feet for one cubic meter of M25 grade concrete

4 Answers   JSW,


What is the difference between shear and tensile strength?

0 Answers  


how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3

10 Answers   IBM,


10 sq m ,25mm thickness 1:2:4 cement and concrete floor how much cement required?       2 , if truck has a capcacity of 8 ton then how many bricks we can put on it ?

1 Answers  


my client's 10 year old building have been affected by the neighbor new building construction with out set back.Old building cantilever bldg hanged by 3". It is supported by introducing 2 rcc columns & beams.Now how to conceal the cracks?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)