States some of the commonly used commands in cad software’s?
No Answer is Posted For this Question
Be the First to Post Answer
1 building project (work in progress) and following are sum detail about his project 1) Using local rebar grade 415 2) Total built up area- 60000 sq.ft 3) Floors to be constructed – 21 storey 4) Estimated requirement of Steel per sq. foot – 7KG/sq.ft 5) Concrete grade – M35 6) Rebars mainly required (sizes)- 16,20,25,32 & (8 mm for stirrups) Wanted to ask u if this person uses 500D…what are the benefits he will be getting? Whether his per Sq. foot consumption can b reduce? If yes den around how much?
what is the crushing strength of stone and bricks?
2 Answers DFCCIL, FWO, Habib Group, HBL, KPSC Kerala Public Service Commission, Mott MacDonald,
Draw the cross section of a boundary wall and label its part with detailing?
what is the lap length
what is the construction cost for per cft of multistorryed building in kolkata?
Why do you want to work here
mix design procedure, i.e m15 to m40
The resultant upthrust on a body partially immersed in a liquid acts through?
5 Answers TNPSC Tamil Nadu Public Service Commission,
What are the different types of runners?
how many types of survey and what are levelling instrument?
What are the applications of modulus of elasticity?
What"s mean by water bound macadam road(WBM)?