how much steel is required foe following components..
footing-
plinth beam-
column-
beam-
slab-
Answer Posted / sjtbehera
footing-2.5%
plinth-3%
column-2%
beam-2.5%
slab-3% of toal cum
| Is This Answer Correct ? | 3 Yes | 5 No |
Post New Answer View All Answers
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is difference between fluidity and workability also how palsticizer works
1.How much batten required for 1 sqm Shuttering. 2.how much pipe & clamps required for staging of 100 sqm shuttering at 5.0 m height.
How to find out slope footing concrete
density of crush sand & crush stone or grit powder
For Wet Mix Mecadam design what is Optimum moisture content
What are the responsibilities of a site manager?
what is features of a typ-ical modern air-conditioning installation?
How to calculate the load of partion in flat slab if we use brick?
Under what circumstances should pot bearings be used instead of elastomeric bearings?
though u r a civil engineer, y r u interested in tcs???
How is calculate the cube molt
What is meant by solid geometry?
What is modular elasticity?
If specific gravity of cement is less than 3.15 what is the cause?