if we have water only for hydration of cement,no water is available for curing of concrete.then how we can do curing of concrete
How to calculate the amount of Brick,cement & sand required for 1 cum of 115mm thick brick work with ratio 1:5 please give me an answer with detailed step
If do cube Test for 28 Days,when shall can do testing? after completion of 28 days it means 29th day or 28th day which one correct?
methode of psc girder stressing
is it compulsory to cast columns along with beams & slabs for monolithic joints
Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?
What is absolute coordinates?
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
what is the defination of an ideal fluid?
What is meant by a context menu in a cad software?
What is the rate of earthwork excavation?
WHAT IS FLOOR AREA RATIO? Y IS IT NECESSARY? HOW TO CALCULATE IT?
why steel tanks are provided (a) for water pressure (b) for wind pressure (c) for earthquake pressure
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)