Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answer Posted / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
What are the different types of civil engineering?
what is the procedure of wet seiving. n percentage of silt in different type of soil?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
What is meant by solid geometry?
please briefly explain calculating or estimating steel quantity for a RCC column?
Who name us Engineer & Why?
How to build the floor to ceiling bookcase?
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Describe the sections included in a typical bill of quantities
all technical question
mix design procedure for 1:6 cement mortar
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
Bearing capacity of soil determined as per ASTM is to design the foundation size.what is the importance of EV1/EV2 value as per DIN .My consultant ask me to test the the soil as per din to find out this ratio to assess the compacted strength of soil ,,?? is it meaning full ??
Mention different types of roof systems?