Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??
Answer Posted / sjtbehera
concrete wastage can be taken in to individual i.e
sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above
cement wastage can be taken 5%,
brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.
| Is This Answer Correct ? | 7 Yes | 2 No |
Post New Answer View All Answers
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
What you understand by building codes?
Aptitude, reasoning, quants, verbal and technical question
I have an span length 16 ft c/c
What is the basic difference between OPC
what is the ingredient value of 40mm and 20mm aggregates?
why we use 19x9x9and 20x10x10 but not other
Why you are leaving present job?
For Wet Mix Mecadam design what is Optimum moisture content
why do we not deduct volume of steel to find actual volume of concrete in practical???
What is meant by scaffolding coefficient?
please give the detail design for the soring and shuttering for 8.5m deep excavation in the sandy soil for 25x10 rectangular streaches
what is the types of surveying?which type of survey carrying for type of work?
Which stone is best for wall construction Laterite Stone or Cement Blocks
what is the clear cover for shearwall?