Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Onsite percentage wastage of Concrete, Rebar, Blockwork/Brickwork, Plaster, Floor tiles ??

Answer Posted / sjtbehera

concrete wastage can be taken in to individual i.e

sand-5%. aggregate-5%, rebar-2.5% up to 16mm than 5% above

cement wastage can be taken 5%,

brickwork- 7% can be taken. plaster and floor tiles can be
taken -2.5% of all material.

Is This Answer Correct ?    7 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2051


How to avoid fly ash seed ball formations in the concrete mixer while mixing of raw materials for fly ash block manufacturing?

1838


how to do cementicious paint for rcc walls of cw pump house

1989


can you please tell me what the current rate of construction material and different construction labourers charge in bangalore ???

1907


How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?

1828


How to do base isolation for RC framed structure using ETABS software?

4136


What is the release of lien?

1128


How we calculate the service time of buildings

1828


What is the difference between linear dimension and aligned dimension?

999


writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order

1889


The definition of national highway

1763


What will you do if a portion of load bearing wall collapses under your supervision?

1949


Tell me about triple point of water.

1078


load combinations how many types for staad design purpose?

2111


how many sqft or cft of work done by a mason per day in all works such as brick,block,concrete,shuttering carpenter,reinforcement fabricator,painter,door window carpenter.....everything thank you

2003