levelling least
count
Answers were Sorted based on User's Feedback
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
What is the rate of earthwork excavation?
What is the difference between oneway slab and twoway slabs
what is the clear cover for shearwall?
Why are pull-out tests performed for soil nails?
What is gauge and gage
what is advantage of vdf flooring ?
Describe the advantages and disadvantages of using plastic and timber fenders?
what is the least count of staff ?
Define slump in terms of slump test
how to calculate MR 9(derivation)
What is the diff b/w ROAD TUNNEL & RAILWAY TUNNEL ??
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)