Answer Posted / babavivek
5mm
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
Spider cracks occur in beam bottom due to––
Formula of mid span bar
What is the difference between engineering stress and true stress?
a) we have 30nos., 300mm dia, 4m length double under reamed piles.calculate excavation quantity.b) tell concrete qty. also.
what is the criteria for the finalisation of pavement thickness in road project?
How many types of slabs are there & how to design it?
Define block?
what is the specific gravity of rubble in plum concert
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
660 square fit two story house make totally how much cement, sant, brick,aggregate, steel totally how much need
how will remove spiderweb cracking in plaster ? what the reasone of make it ?
How do we calculate the power of centrifugal pump?
How do you determine specific gravity of cement?
How to calculate material and labor required for 100 m2 plaster?