Answer / rustam jamal
Assume Column Size- 1.200x0.300 and Height = 3.000
than Qty for Conc. = =1.2x0.30x3.0= 1.080Cum
Shuttering Area = 2x1.2x3.0=7.20
= 2x0.30x3.0=1.8
Total =9.0Sqm
In 9.0sqm Shutterin 1.08 Cum Conc. req.
so For 1 Cum Shuttering Qty = 8.333
In case of Columns we required 8.33 sqm of shuttering area
in 1 Cum of Concrete
Is This Answer Correct ? | 88 Yes | 31 No |
Answer / ajinkya patil
for 1.2x0.3 c/s and 3 m height
total shuttering area = ((1.2*2)+(0.3*2))*3= 9 sq.m
calculate total plywood or shutters required
a)cost of ply or shutter panels.
b)cost of supporting material required.
c)labour cost of shuttering.
d)labour cost of deshuttering.
e)jointing materials like nails & tie bars & other miscellaneous material
cost per sq.m= (a+b+c+d+e)/total shuttering area
Is This Answer Correct ? | 26 Yes | 7 No |
in steel bar weight formula (d^2/162).so what is 162.
12 mm dia not available at site for raft, 10 mm are available at site how to calculate?
how to draw road profile
what is the purpose of laying PCC?
how many labour is required for 1cum of concrete?
Difference between P.C.C and R.C.C?
24 Answers Amit Enterprises, D Link, SAT, Surya Constructions,
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Hi is it any equation or relationship that describe the stress-strain diagram in concrete deep beam?
What are Standard weights for concete of gradeM10,M15,M20,M25,M30 Etc.
Define Workability ?
What is the cutting length formula of tringle ring?
wat is six sigma course ? is it good for civil engineers . wat is pmp certification ? is it good for civil engineers .