what"s the different between OPC (ordinary portland cement)
and PPC (pozalana portland cement)?
Answers were Sorted based on User's Feedback
Answer / nagasindhu.k.n
ordinary portland cement is mixture of calcarious and
argilaceous materials.
PPC ios a mixture of pozzalanic materials like fly ash
volcanic ashes, shales, tuffs, etc.,
| Is This Answer Correct ? | 24 Yes | 5 No |
Answer / amiyaranjan
ppc is low heat generate cement with flyash blinded
aslo economical
opc is early strength cement
| Is This Answer Correct ? | 4 Yes | 0 No |
Answer / deepthi ramachandran
The Portland Pozzolana Cement is a kind of Blended Cement
which is produced by either intergrinding of OPC clinker
along with gypsum and pozzolanic materials in certain
proportions or grinding the OPC clinker, gypsum and
Pozzolanic materials separately and thoroughly blending
them in certain proportions.
Pozzolana is a natural or artificial material containing
silica in a reactive form. It may be further discussed as
siliceous or siliceous and aluminous material which in
itself possesses little, or no cementitious properties but
will in finely divided form and in the presence of
moisture, chemically react with calcium hydroxide at
ordinary temperature to form compounds possessing
cementitious properties. It is essential that pozzolana be
in a finely divided state as it is only then that silica
can combine with calcium hydroxide (liberated by the
hydrating Portland Cement) in the presence of water to form
stable calcium silicates which have cementitious
properties. The pozzolanic materials commonly used
are:Volcanic ash, Calcined clay, Fly ash,silica fumes
OPC is environment friendly as well as economical
| Is This Answer Correct ? | 3 Yes | 3 No |
What is the PH value for domestic water supply
how to calculate required shuttering material like props,spans,plates ..etc for a slab?
1 Answers NCC, Shoba Devlopers,
Defination of civil engineering
What is the absolute pressure scale?
actually dia of the bar reduce asper drawing spacing also decrease that time so how to calculate the spacing of with respect to changed bar dia?
I am doing a engineering contract with GOI. I have purchased certain material from outside Maharashtra and paid CST on that material @ 5.25%. Please intimate whether I will be liable for VAT or VAT on works contract or not.
curing of concrete why 7day's,14day's 21day's 28days
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.
How do you measure concrete?
what will happen if we use milk or oil in the place of water in concrete??????????
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)