is load combination is necessary in staad pro design
Answers were Sorted based on User's Feedback
Answer / ved prakash mohapatra
Yes, absolutely it is necessary. Without load combination consideration we can't make safe structures.So according to code different combinations are present in staad pro.We hav to choose which one will be applied or appropriate.
Is This Answer Correct ? | 23 Yes | 1 No |
Answer / kalyani singh
yes it is necessary but we can also give different load
combinations individually and using load combination option
automatically all types of load required for d design is
generated so it is quite easier.
Is This Answer Correct ? | 13 Yes | 3 No |
fffdldl
for Staad pro
Load Combination 2 1.5(DL+LL)
Is This Answer Correct ? | 9 Yes | 4 No |
How much quantity of Cement and Sand required for Cement Sand Ratio of 1:1 and volume of pile is 0.61 m3
what is the development length formula as per concrete grade
which has high coefficient of discharge venturimeter or orificemeter
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
important question on stones
where vr providing singly reinforced beam. i want to know the location of it in a building
when will the position neutral axis shifted in beams
Dear Sir , I have my diploma in civil engineering in distance mode, so can i do my B.teck in regular stream . kindly suggest Regards Ramakrishna
how much to get of BRC lapping in full yield and half yield ?
What are the uses of groynes?
what is formula to calculate compressive strength of concrete or procedure??
what are the criteria for choosing the span for the bridge (highway bridge)