What is the wastage % of concrete in Conventional
shuttering design & Mivan Shuttering for high rise building.
Answers were Sorted based on User's Feedback
Answer / sahilshah.civil@gmail.com
In general 2% wastage consider for concrete
Is This Answer Correct ? | 0 Yes | 1 No |
wat happens to the foundation when only live & dead loads are considered( wind load is excluded) during the design of tall structures. options are: a)only settlement in the internal structure and not external structure b)only settlement in the external structure and not internal structure c)no differential settlement d)none of the above
4 Answers BBJ Construction, IOCL,
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
For m25 1:1:2 How to get the quantities of cement,sand,agg for 1cu.mt. thnks in advnce
Any strength is a stress but any stress is not strength
how to calcalate for roof beams & slab reinforcement design specified?
What quantity of 1.0 m3 bricks required?
Common strng of kg/m3 building materials
What is demising walls?
how to calculate number of bitumen for road asphalt
How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?
35 Answers Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,
what is weight of asphalt concrete
How to test the soil compaction test?