wat is the necessity of finding shear and bending moment in
a structure. wat will happen if it is not consider. other
than shear cracks and deflection is there any other failure
happen.
Answer / t.madhu sudhan
Earthquake failure n also over reinforced failure which is more dangerous as it doesn't provide any sign of failure as it in case of underreinforced structure
| Is This Answer Correct ? | 0 Yes | 0 No |
What are the govt approvals required for starting of power project. means from initial site grading and excavation work.exm. blasting in hard rock, deep excavation, cut off trees from site.
how many average of shuttering in one cubic meter concrete
quantity of sand in cft in 1:6 cement sand mortar
why the cube depth is 150 mm which is used for testing
How many feet are in 4 square yards?
how do we calculate wastage of steel in the site,what r the items to taken into account for wastage calculation?
What are the different types of civil engineering?
what is the minium content of cementous material per cu meter
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
How to cal. The weight of hollow pipe?
I need Bhel engineertrainy test papers in civil engineering please send to email id - hisandy66@gmail.com
indian standard split spoon sampler
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)