how to calculate the 45 degree bent up length. if we given
that whether the total length of the slab reinforcement will
increase or not. mantion it clearly please. this is for bar
bending schedule purpose?
Answers were Sorted based on User's Feedback
Answer / satyanarayana
0.42 d where d is the depth of slab minus bottom and top
covers
| Is This Answer Correct ? | 15 Yes | 1 No |
Hi frens, i need MahaGenco previous exam papers of civil engineering as well recent MahaTransco exam papers? If anybody having it plz help or at least i want to know which subject shuold i focus for studies? Thanks in advance.
what is the cost of per cum of pile foundation?
what is project?
explain yourself?
1 Answers Infosys, Omaxe, Siscom, TCE,
What is meant by a context menu in a cad software?
What are causes of cracks in outside plaster of a building and how we prevent it during constructions?
what is the meaning of m35 grade concrete ?
2 Answers Aparna Constructions,
how to create our resume?
0 Answers Sunraj Construction,
How do you finishing structure....any one structure ....
Why should pumping be not used in case of concreting works?
What is the zero value in quantity surveying
How bonding is done for composite massonary?
2 Answers Tarmat Infrastructure,
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)