What is the wastage % of concrete in Conventional
shuttering design & Mivan Shuttering for high rise building.

Answer Posted / sahilshah.civil@gmail.com

In general 2% wastage consider for concrete

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What is braced excavation all about?

712


where i can get material costs on weekly basis

1660


How do you calculate the power of centrifugal pump?

647


The internal dimensions of a wire house 15m*5.6m and the maximum height of piles is 2.70m. What is the maximum number of bags to be stored in two piles ?

1540


why demand factor less then 1 ?

1770






how much need sand and cement for 1 cft roof construction?

3965


How do you prepare Material Recovery Statement for deduction from contractors bills?

1103


How to calculate the load of partion in flat slab if we use brick?

1383


What is the zero value in quantity surveying

2010


Rate analysis of Vitrified tile in cement mortor 1:3

3935


What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?

2390


for pretensioning which will yield first and same for post tensioning?

1710


Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.

1743


What do you mean by honeycomb in concrete?

704


Types of column foundation and how to calculate its steel quantity.

1440