200sq.ft of slab and thickness is 6" in that how much cement
are required(bags), sand & aggregates are in cu.m, choose
grade of concrete is m20.
Answers were Sorted based on User's Feedback
Answer / shivang
cement bags= 23 bags=((1/5.5)*1.57))/0.035
Sand = 1.21 m3= ((1.5/5.5)/1.57))*2.83
Aggregates = 2.42 m3= ((3/5.5)/1.57))*2.83
| Is This Answer Correct ? | 6 Yes | 0 No |
Answer / single ravi
200*.5=100cft/35.32=2.83cum
2.83*6.5=18.39bags
18.35*50=919.75kg of cement required for the given problem
| Is This Answer Correct ? | 6 Yes | 2 No |
Answer / md afroz alam
22 bags of cement
42 cft sand
83 cft agg, 20mm size
| Is This Answer Correct ? | 0 Yes | 0 No |
Answer / guest
Cement bag is 20 Nos
Sand 50 cft
Aggregates 100 cft
| Is This Answer Correct ? | 0 Yes | 1 No |
why 50% more is assumed while calculating dry volume of coarse and fine aggregates in concrete calculations.whether 50% more is correct? How is it decided? whether the same is applicable to cement volume. Also what about cement mortar dr volume? How much more is to be considered for dry volume of mortar.
what is the meaning of 40/20 src
How Much the Lean concrete Density?
0 Answers Techno Unique Infratech,
Sir, Iam Applied in rrb for the posts of Junior Engineer.I want to know about the or question previews to study well.Pl send it to shukla_varun1985@yahoo.com.
How many cement sand ballast in cc 1:4:8 40mm
What is full form of r.c.c?
what is the use of steel rods of 16mm or 20mm used for 4.45mts for closing gutter.one mate consumes how many kgs with a gap of 6inches.
what"s the sort of beams?
wat is fe full form in fe4l5?
What type of foundation preferred in sandy soil ?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
How will you Engage Labours on Site?
0 Answers Amarprakash Developers,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)