200sq.ft of slab and thickness is 6" in that how much cement
are required(bags), sand & aggregates are in cu.m, choose
grade of concrete is m20.
Answer Posted / guest
Cement bag is 20 Nos
Sand 50 cft
Aggregates 100 cft
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
All aptitude question of Bechtel
can we compare the combined core of DBM and BC density with average density of Lab DBM and Lab BC density
Civil engineering material testing Standard results
Define What does civil status mean?
psc girder detail
What are the different types of foundation?
Coverage of 25mm.thick ratio of 1:4 cement mortar?
what is civil all interview questions
How much cement is require in one sqft area in a G+3 residential construction.
what is the breaking strength of wall tiles
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
For removal of formwork of simply supported slab / beam from where to start the deshuttering? ( Max Bending moment of the simply supported beam is in the center hence is it required to start from the supports?)
What is the distance between railway tracks?
What was asked in isro civil interview