200sq.ft of slab and thickness is 6" in that how much cement
are required(bags), sand & aggregates are in cu.m, choose
grade of concrete is m20.
Answer Posted / single ravi
200*.5=100cft/35.32=2.83cum
2.83*6.5=18.39bags
18.35*50=919.75kg of cement required for the given problem
| Is This Answer Correct ? | 6 Yes | 2 No |
Post New Answer View All Answers
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
How much cum. Brick work can do by 1 madon
Thumb rule for steel qty for 1m2 in kg/m2 column slab footing beam
What quantity of 1.0 m3 bricks required?
In case if concrete box girder bridges how is the number of cells determined?
Define a polyline?
Name the main components of a cad gui?
How to determine thee cut length for steel reinforcement bars in R.C.C design
115mm thickness brick work how to required mortar
What are the ingredients of pre-stressed concrete?
What is difference between combin footing & rapt footing
which are the Indian auther books for STONE COLUMN/GRANULAR PILES?
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
how to find quantity of concrete in PCC M15
how much cost of single coat 20mm thick plastering per sqre meter