What is the difference between Backfilling & Refilling in
Earth Work Group Item ?
Answer Posted / sjtbehera
Backfilling is done after a structure complete its ground construction. Refilling means cutting then immediate filling but you go without technical both are same meaning.
| Is This Answer Correct ? | 2 Yes | 5 No |
Post New Answer View All Answers
how i convert mm into standard wire guage (SWG)no.
I want to know how much the lapping length for the pilecap reinforcement.. we r using single pile cap which is 24mby54m and 2.5m depth.. total 91piles are supporting the pile cap.. how to do a steel reinforcement??
IN Compression testing machine 1division =10KN ,then what is compressive strength of 100*100 mm cubes at a load of 320 KN
percentage of metal,clay or soil & water in water bond macadam roads to know the quantities for each in total volume of 11500 cubic meters
what is the venturi effect in buildings? what is green house concept?different types of dams? which dam is economical arch dam or gravity dam. what are the conditions favourible to both of them?
1:4:8 pcc calculation 591 cu.ft
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
How to design staircase.plz tell me formula for the design the staircase.
What is thumb rule for deep trench excavation
what is relation between SPT N value and driving piles after conducting a soil test?
what does the grad of cement shows (denotes)?
5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)
What is OSHA compliance?
What is GSB gradation
How to take labor charges for construction of 1cum of concrete?