What is the difference between Backfilling & Refilling in
Earth Work Group Item ?
Answer Posted / sha
The excavated sand filling called back filling..and filling
red earth from out side is called refilling
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
what is a well
how to tie 10 legged stirrups
questions with answers to face an interview of an civil engineer regarding RCC buidings
1.Fe500 and Fe550 having more yield strength than Fe415.But why are we prefering Fe415.? 2. d^2/162 formula for knowing the steel wt/m apply all these three? Thanks.
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
What is Rankine Cycle?
What are the methods in tiles flooring ? What are the methods in brick work? What are the methods in plastering ? What are the methods in wall tiling?
For what purpose bedding is used under storm water drains, explain?
for a column of size 400*230mm column reinforcement= 8-20x(cant write the symbol,i hope u guys undersstand,something like (fi) column stirups=8x@(4l) 230c/c 1)what does these mean 2)how to calculate quantity of steel for this column(ceiling height 11 ft)
how to nfind out the specific gravity of sand.aggregate,water please help...
For fine aggregate which is most suitable River sand or crusher sand & why ?
why top layer of block work shoud be full size if any cut block adjustable than another layer?
length where bent up is made in slab of bridge from one end
What black man invented the clothes dryer?
how many monpower required for 1 sqm normal RCC structure ( includes finishes & MEP )