What is the difference between Backfilling & Refilling in
Earth Work Group Item ?
Answer Posted / sha
The excavated sand filling called back filling..and filling
red earth from out side is called refilling
| Is This Answer Correct ? | 2 Yes | 9 No |
Post New Answer View All Answers
how to diffenentiate the fixed beam and simply supported beam in the execution while reading the drawing and how the reinforcement detail will be differ for the above.
What is meaning of FREE STANDING STAIRCASE ?
material used for mendrel use to bend epoxy coated rebar
I want to know about rolling margin of steel :- For eg. If 2nos. bundle of 8mm dia steel with17 rods each of length 12m comes to store. During testing of 1m rod of each bundle it was found that 1rod has weight .405kg/m while other has .385kg/m. Now what will happen in case of steel payment and measurement payment ? Regards,
Draw a neat sketch showing the 'throat' of a welding in a plate girder ?
Types of column foundation and how to calculate its steel quantity.
what r you reqired for concrete baching plant?
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
what is the design procedure for building
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
types of survey and levelling instrument ?
in one SQM plaster how much Cement and sand consumed in ratio 1:4
Why you are leaving present job?
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh