How to calculate the length of chairs provided to support the
top rebar in concrete foundation
Answer Posted / sumit
Practicaly, it should be min.500mm or atleast 3 no. of
rebar should be rest upon the same whichever is higher to
be considerd.
| Is This Answer Correct ? | 5 Yes | 14 No |
Post New Answer View All Answers
Can we use concrete of slump cone in cube casting in which we have already measured slump?
how to conversation of all construction material in to brass
16 questions out of 55 were from the book GUPTA N GUPTA OBJECTIVE of civil engineering. Total ques were 4 ques from hydraullics, 7 from BMC, 4 FROM SOM, 4 from soil mechanics, 6 from transportation, 5 from engineering drawing.
How to find the cuplock pipe qty in staging for Minor bridge?
I measured pcc work as 15.34 m cube , the ratio is 1:5:10 ,want to know the cement, sand and metal used for pcc measured as 15.34 m cube at this ratio.
why development length = 50D . why not 100D
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
.5Ast
in the earthquqke the profile of water on dam is parabolic or not
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
what is the productivity in aluminium shuttering per day
what is called the inverd level of mabhole chamber?
What is the name of this multiplication factors ?
how do you calculate the quantity of steel,cement for plinth beam. (example size 41'*0.58'*1.08')
what does the grad of cement shows (denotes)?