proportions of m10, m15, m20, m25, m30, m40, m45, m50, m60,
m70, m75, m80 etc
Answers were Sorted based on User's Feedback
Answer / muralidhar
m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
Is This Answer Correct ? | 175 Yes | 28 No |
Answer / biswajyoti mukherjee
M10= 1:3:6
M15= 1:2:4
M20= 1:1.5:3
M25= 1:1:2
M30= 1:1:1.5
M35= 1:1:1
M40= 1:1/2:1
Is This Answer Correct ? | 100 Yes | 24 No |
Answer / sag
m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
m30 and above is done by mix design
Is This Answer Correct ? | 69 Yes | 12 No |
Answer / bhavin maniyar
m10= 1:4:8
m20= 1:1.5:3
m25= 1:1:2
m30=?
m35=?
m40=?
Is This Answer Correct ? | 35 Yes | 13 No |
Answer / nitesh
m10-1:3:6
m15-1:2:4
m20-1:3/2:3
m25-1:1:2
m30 and above is done by mix design
Is This Answer Correct ? | 18 Yes | 5 No |
Answer / ramveer dhakad
M5 =1:5:10
M7.5=1:4:8
M10=1:3:6
M15=1:2:4
M20=1:1.5:3
M25=1:1:2
M
Is This Answer Correct ? | 8 Yes | 1 No |
practically where this hinge and roller condition used
how much grade of concrete can be used for different structural element such as slab,beam,column,footing & plinth beams? and type of cement can be used in construction work & also types of cemnt grades
Why do you want to work here
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
how to calculate estimation for puttey... give me an example
9. What have you done to improve or develop your knowledge / professional qualifications in the last year?
LET ME KNOW HOW IS CALCULATE RUBBLE WALL .3'00" IN BOTTOM 1' 6" IN TOP HEIGHT 8' 0" AVERAGE. length 200'00". please give correct answer.
How to calculate material and labor required for 100 m2 plaster?
why steel stirrups in column have more spacing at center and less spacing at both ends??
What is the lap lenth for welded joints for reinforcement bars. and what is its IS code no.
what bending moment?
How much does it cost for a R.C.C roof slab of size (25 X 20) given in feets using 1:2:4 concrete mix of M20?