What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answers were Sorted based on User's Feedback
Answer / rajesh.d.v.s.p.
for columns=1day
for beams and slabs=14 days
rcc walls= 1day
fotting 1day
stair case=7 days
Is This Answer Correct ? | 2 Yes | 6 No |
Answer / atul bharadwaj
salb-1 second
beam 2 light year
column-no need of shuttering(use pre cast columns)
i dont know what is rcc wall
footing-30 years
staircase-in one storey building there is no staircase
Is This Answer Correct ? | 14 Yes | 87 No |
How to build the floor to ceiling bookcase?
What are the steps involved in the concreting process?
how much quantity of tile placing can be finished by one mason per day?
how to calculate steel quantity in plinth beam&footing
What are the types of concrete
What do you understand by “preset” during the installation process of bridge bearings?
what is the quantity of cement,sand and aggregate in 600*600*1600 mm in 1:4:8
what is the meaning of sleeves in reinforced concrete????. where its coming???.
cavitations is caused by
Lime used for white washing is- (1) quick lime (2) Hydrated lime (3) caustic lime (4) lime milk
What is Grid floor and mention its advantages ?
What is a hatch patterns?