What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answers were Sorted based on User's Feedback
Answer / rajesh.d.v.s.p.
for columns=1day
for beams and slabs=14 days
rcc walls= 1day
fotting 1day
stair case=7 days
| Is This Answer Correct ? | 2 Yes | 6 No |
Answer / atul bharadwaj
salb-1 second
beam 2 light year
column-no need of shuttering(use pre cast columns)
i dont know what is rcc wall
footing-30 years
staircase-in one storey building there is no staircase
| Is This Answer Correct ? | 14 Yes | 87 No |
If your drg told used 600 dia hume pipe for culvert but due to market problem available 300 dia hume pipe,den how much humepipe you provide(300 dia) instead of 600 dia?
How do you find the weight of rod per metre lenth ?
Explain what are the skills required to become an architect?
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
when does sedimentation occur before filteration, along with it, along with chlorination, after chlorination?
what does '415' in FE415 stands for??
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
WHAR IS DIFFERENCE BETWEEN NOMINAL MIX & DESIGN MIX IN DETAIL
where do Tie beams used in foundations?
How to convert n/mm2 in to kg/cm2?
38 Answers Rvr Projects Pvt Ltd, Soma Enterprises, Unitech, Wipro,
levelling least count
1.why can't we used sea sand in construction? 2.can we change sea sand into normal sand? if yes how?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)