What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / rajesh.d.v.s.p.
for columns=1day
for beams and slabs=14 days
rcc walls= 1day
fotting 1day
stair case=7 days
| Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
Does brick grows bigger every year?
what is the ingredient value of 40mm and 20mm aggregates?
Explain different types of rcc pipes.
What is the primary difference between adsorption and absorption?
residential buildings,mixing of concrete,structural,construction material,site handling.
Could you please give me an answer to the mixing proportion of concrete M1 grade (sterngth of 1 MPa)?
What is need for setting limits?
WHAT IS YOUR CURRENT SALARY
can you mail me detailed procedure,entire syllabus and practice papers of mpsc civil engineering branch.I am in third year now
What is the meaning of Brick- M 35 grade? Is it a common brick or it's a concrete brick?
how to calculate cut length of re-bar in a circle . because we not place same length of re-bar in whole circle maximum in center and minimum at corner so how to calculate middle bars???
how to conversation of all construction material in to brass
For the construction project what capital cost has to be taken in consideration?
which type of instrument included in plumbing work?name of instrument?
what is the price of a cubic meter of concrete on international market?