What are the deshuttering time for
Salb
Beam
Column
RCC Wall
Footing
Staircase
Answer Posted / rajesh.d.v.s.p.
for columns=1day
for beams and slabs=14 days
rcc walls= 1day
fotting 1day
stair case=7 days
Is This Answer Correct ? | 2 Yes | 6 No |
Post New Answer View All Answers
Define unit atmospheric pressure? Difference between gauge pressure, absolute pressure?
Technical Question of Civil Engineering
why is the column design?
how do we calculate quantity of cement sand and aggregates in 1m3 of m20 m25 grade concrete?
how to estimate costing from quantity givin in BOQ and according to this how we fill tender and final rate for perticular work.....?
What are the phases inspections are done by local authority while construction?
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
What is the force exerted by the tacoma narrows bridge?
can you provide a link for manual design of building?
how to prepare site mix design
Describe the role of independent Quantity surveyor?
What are the different methods for drawing an arc?
how meny typs of renging rod?
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.