Before casting a basement roof slab which is connected with
retaining wall surcharge load (i.e. sand or earth
filling) outside the retaining wall is prohibited because
of––
No Answer is Posted For this Question
Be the First to Post Answer
if the slab is 2 way then,where we will put lapping upper and lower side?means near to beam or center and near to center?
How foundation is designed, Column design and beam design
0 Answers College School Exams Tests, L&T,
is there any thumb rule for calculating construction cost of the building with pile foundation per sft. area?
What is the difference between one-way slab and two-way slab?
the minimum percentage of steel for 2m rcc slab
how to convert feet value in meter value?
can we go for short rcc column without any steel rienfocement carrying truely axial load???
What is the differential length of steel reinforcement? What is the over lap length of steel in different grades of concrete?
if L*B*H = 20 then direct no of bricks =20 *500
What is the crank length in the slab?
how to calculate the steel for rcc slab 1100 Square feet
cement and sand required for one block of size 0.23*0.15*0.46