SAND AND STONE AGGREGATES WASTAGE PERCENTAGE IN CONCRETING
WORK?
No Answer is Posted For this Question
Be the First to Post Answer
Respected sir i am appearing for the exam this year.I will be highly obliged if u kindly send me last year's interview paper on civil engineering in my email address debosmitroy@yahoo.in
What is the construction cost per sq foot for residential building and give bifurcation of same?
compressive strength of country bricks in india
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
What is m & 20.& what is fe&415.
how to find ssm in foundation?
how much quantity of 1.5" nails and 2.5" nails are required for conventional formwork shuttering?
how to caluclate sienerge qty in construction in ap
0 Answers Rites, VR Residency,
HOW TO CALCULATE LABOUR COST FOR CONCRETE WORK PER CUBIC METER.
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
10'0" × 10'0" Proposed room Start and Finish How many Cement & Sand & Bricks & Metals & Steels Need
Why should pumping be not used in case of concreting work?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)