Middle point of any slab is raised 10-12 mm during shuttering work because–– ..

Answer / mughalsab

if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.

Is This Answer Correct ?    9 Yes 1 No

Middle point of any slab is raised 10-12 mm during shuttering work because–– ..

Answer / rj

so as to have a camber at the middle area.

Is This Answer Correct ?    8 Yes 4 No

Middle point of any slab is raised 10-12 mm during shuttering work because–– ..

Answer / bharat gurav

because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm

Is This Answer Correct ?    1 Yes 4 No

Middle point of any slab is raised 10-12 mm during shuttering work because–– ..

Answer / amar kantak

FOR POURING CONCRETE

Is This Answer Correct ?    0 Yes 8 No

Post New Answer

More Civil Engineering Interview Questions

what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram

1 Answers   jlpl,


how much steel required for 1 square meter slab?

5 Answers   L&T, Lanco,


what is construction joint? why do we give expancion joint in building?

4 Answers   jusco, L&T,


IS sobha developers ,bangalore an good place to work for the freshers

5 Answers  


how you calculate the data (all parameter) after transient response method i.e.pile intigrity test on pile.

1 Answers  






calculate qty of sand in 15 mm plaster for 100 sqm.

5 Answers   NHPC, Vellapally,


How to calculate the area of a irregular sized land in square feet?and what will be the total area of this land South-51.1ft , North-47.7ft , East-53.3ft , West-54ft ?please explain me how to calculate?

0 Answers   AIZAZ General Contracting General Maintenance, GK Realtors,


how many days we should curing for plastering,brickwork,concrete?

10 Answers   Al Faraa, Alfaraa, CCCL, Consolidated Construction Consortium Limited, Wipro,


What is rolling stock

0 Answers  


what is the diffrence between grade beam and plinth beam

1 Answers  


Required concret Surface Temperature prior to coating of epoxy pain with references ASTM or ACI whatever

0 Answers  


what a pigment?

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)