Answer / mughalsab
if i dont raised at mid ponit of slab so when we poured concrete then the slab is sag at mid point due to its own weight therefore we raised at mid point so when concrete is poured then the slab is going to its corect position.
| Is This Answer Correct ? | 9 Yes | 1 No |
Answer / bharat gurav
because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm
| Is This Answer Correct ? | 1 Yes | 4 No |
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
HOW MUCH STEEL REQUIRED FOR SLAB OF AREA 23'3"*18.3"? FOR SLAB HOW MUCH DIAMETER BAR WILL USE?
How many number of bricks required for 1 cum & how much mortar quantity require for 1 cum
22 Answers Assurance, Campus Interview, R Tech Developers, Ramdev Construction, Synergy,
how do you intend to overcome such challenges?
howto calculate the quantities of material used in fly ash brick after finding the volume??
What is cementation
How cracks in concrete can be avoided?
How much cement,sand,bricks and water needed for 1square metre brick work?
What was asked in isro civil interview
what is the % wastage of cement in rcc
What is the purpose of the gap in the road on this bridge?
difference between high way pavement and local road?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)