Middle point of any slab is raised 10-12 mm during
shuttering work because––
Answer Posted / bharat gurav
because at middle point act point load & share force act at
L/4 so extra steel r provided...............but at mid-span
no provide extra steel due 2 sla raise 10-12mm
| Is This Answer Correct ? | 1 Yes | 4 No |
Post New Answer View All Answers
Explain creep?
What are the different types of foundation?
What is the origin of name railway sleepers?
The portion of a brick cut across the width is called?
What is Heavy Concrete & Normal Concrete
I want to know the relevant IS codes of practice which deals with different testings of cement-sand mortar (nominal mix)that is being normally used for brick work or plaster work in the construction work.
How to arrive dry volume of concrete (1.52 to 1.57) ?
What is an object snap mode?
What is Grid floor and mention its advantages ?
PL.tell me about civil engineering questions with answer
How did street originate in the plumbing term street ell?
Cement consumption of one cubic meter of aerocon blocks masonry?
What is the use of array command?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
Which type of plywood & sizes using in construction projects ?